BR01: US 11/58 Lee Highway

BR01 Overview Map

I-81 NB Ramp Terminal TO US 58 / Jeb Stuart Highway

Survey

The survey regarding potential transportation safety and operations improvements on Route 11 between I-81 Exit 19 (northbound on-ramp) and Route 58 in Washington County is complete.

Project Purpose

The purpose of this study will be to analyze the operational and safety issues identified along US 11/US 58 between Exit 19 and the US 11/US 58 (Jeb Stuart Highway) intersection in Washington County. This corridor has a high number of crashes attributed to poor spacing between the intersections and various site access driveways located along the corridor. High traffic volumes with numerous conflict points along the corridor contribute to deficient operational conditions which impact the flow of traffic along US 11/US 58. It is also noted that when there is an incident along I-81 in the area, this corridor must serve as a detour route. The objective of this study is to identify cost-effective preferred improvement alternatives that address the deficient conditions and minimize ROW impacts.  

Study Partners

  • Washington County
  • Bristol Metropolitan Planning Organization
  • Mount Rogers Planning District Commission
  • Mountain Lynx Transit

Key Points of Contact

District Lead: Blake Ailor

Lead Consultant: Alex Shoemaker 

Schedule

PHASE DATES TASKS
Phase 1 August 2021 – September 2021 Problem Diagnosis/Brainstorm Alternatives
Phase 2 October 2021 – March 2022 Stakeholder/Public engagement and feedback
Phase 3 March 2022 – July 2022 Investment strategy cost estimation and refinement

Last updated: April 4, 2024

Alert Icon

Please note that this file is not ADA compliant. Choose one of below options: