Route 163 (Memorial Ave)
survey
The survey regarding potential transportation safety, congestion, and bicycle/pedestrian improvements at the intersection of Route 221 (Oakley Ave.) and Route 163 (Memorial Ave.) is complete.
project purpose
The purpose of the project is to address the vehicular and pedestrian safety concerns, congestion mitigation, and capacity preservation at the US Route 221 (Oakley Ave) and Route 163 (Memorial Ave) intersection. The study intersection is identified as VTrans Priority 1 Node; and the project aims to identify medium and long-term solutions for vehicles, bicycles, and pedestrians.
study partners
City of Lynchburg
Central Virginia Transportation Planning Organization
key points of contact
District Lead: Rick Youngblood
Lead Consultant: Stuart Samberg
SCHEDULE
Phase 1 | August 2021 – September 2021 | Problem Diagnosis/Brainstorm Alternatives |
Phase 2 | October 2021 – March 2022 | Stakeholder/Public engagement and feedback |
Phase 3 | March 2022 – July 2022 | Investment strategy cost estimation and refinement |
documents
LY05 Executive Summary Phase 1 - PDF, 11MB |
LY05 Executive Summary Phase 2 - PDF, 780KB |
LY05 Stakeholder Presentation Phase 1 (Slides 24-26 specifically relate to LY05) - PDF, 3MB |
LY05 Stakeholder Presentation Phase 2 (Slides 28-38 specifically relate to LY05) - PDF, 4.3MB |
LY05 Public Engagement Summary Phase 2 - PDF, 379KB |
LY05 Final Report - PDF, 5MB |