The survey regarding potential transportation safety and operations improvements on Route 11 between I-81 Exit 19 (northbound on-ramp) and Route 58 in Washington County is complete.
project purpose
The purpose of this study will be to analyze the operational and safety issues identified along US 11/US 58 between Exit 19 and the US 11/US 58 (Jeb Stuart Highway) intersection in Washington County. This corridor has a high number of crashes attributed to poor spacing between the intersections and various site access driveways located along the corridor. High traffic volumes with numerous conflict points along the corridor contribute to deficient operational conditions which impact the flow of traffic along US 11/US 58. It is also noted that when there is an incident along I-81 in the area, this corridor must serve as a detour route. The objective of this study is to identify cost-effective preferred improvement alternatives that address the deficient conditions and minimize ROW impacts.
study partners
Washington County
Bristol Metropolitan Planning Organization
Mount Rogers Planning District Commission
Mountain Lynx Transit
key points of contact
District Lead: Blake Ailor
Lead Consultant: Alex Shoemaker
SCHEDULE
Phase 1 | August 2021 – September 2021 | Problem Diagnosis/Brainstorm Alternatives |
Phase 2 | October 2021 – March 2022 | Stakeholder/Public engagement and feedback |
Phase 3 | March 2022 – July 2022 | Investment strategy cost estimation and refinement |
documents
BR01 Executive Summary Phase 1 - PDF, 5.1MB |
BR01 Executive Summary Phase 2 - PDF, 544KB |
BR01 Stakeholder Presentation Phase 1 - PDF, 9.2MB |
BR01 Stakeholder Presentation Phase 2 Alternatives Results - PDF, 5.5MB |
BR01 Public Engagement Summary Phase 2 - PDF, 326KB |
BR01 Final Report (Appendices available upon request) - PDF, 6MB |