U.S. 250 (Ivy Road) – Albemarle County/City of Charlottesville
Provide input about potential improvements along U.S. 250 (Ivy Rd.), including the interchange with U.S. 29, in Albemarle County and the City of Charlottesville.
Take the survey through May 10, 2024.
The purpose of this study is to identify project recommendations for the U.S. 250 (Ivy Road) corridor, including the interchange with U.S. 29, within Albemarle County and the City of Charlottesville. This study will focus on improving roadway safety, reducing traffic congestion, improving access, and enhancing multimodal accessibility and connectivity for pedestrians, bicyclists, and transit users, including how these needs might be satisfied by facilities within the Route 601 (Old Ivy Road) corridor. The study will build off previous study efforts for the study area led by VDOT and the localities and provide multiple opportunities for public input. The project recommendations that come from this study will be developed into funding applications for SMART SCALE Round 6 and other transportation funding programs.
VDOT greatly appreciates the recent engagement with the community on the possible transportation solutions in the Ivy Road and Old Ivy Road corridors and recognizes that recent transportation studies in this area gathered significant public input. As we committed to you, we are initiating a new study of this area to take a broader view of the Ivy Road Corridor and find more comprehensive short-term and long-term solutions to the vehicular and multimodal challenges. We will use the previous comments to guide this study and encourage you to continue to provide feedback.
District Lead: Charles Proctor
Lead Consultant: Jeff Kuttesch
PHASE | DATES | TASKS |
---|---|---|
Phase 1 | May - October 2023 | Diagnose Problems/Conduct Initial Public Outreach/Brainstorm Alternatives |
Phase 2 | October 2023 - January 2024 | Evaluate Preliminary Alternatives/Conduct Public Outreach and Obtain Feedback/Select Preferred Alternatives |
Phase 3 | January-July 2024 | Conduct Risk Assessment/Develop and Refine Preferred Alternatives/Prepare Cost Estimate and Investment Strategy |
The Phase 1 survey regarding potential transportation safety, congestion mitigation, access, and bicycle/pedestrian/transit improvements along U.S. 250 (Ivy Rd.), including the interchange with U.S. 29, in Albemarle County and the City of Charlottesville is complete.
Dates | Number of Participants (unique individuals) |
---|---|
August 1-28, 2023 | 1440 |
The following needs have been identified for this study. Do you agree with this initial assessment? | |
---|---|
Safety | 83% |
Congestion Mitigation | 76% |
Bicycle and Pedestrian Accessibility / Connectivity | 75% |
Access | 57% |
Transit Accessibility / Connectivity | 49% |
What mode(s) of travel do you use when traveling along the study area? | |
---|---|
Personal Vehicle | 94% |
Cycling | 34% |
Walking | 26% |
Taxi / Uber / Lyft | 6% |
Carpool / Vanpool | 3% |
Metro Bus, Local Bus, or Commuter Bus | 3% |
Truck or Commercial Vehicle | 2% |
Other | 1% |
Last updated: April 26, 2024